|
The Mobile Module Workover Unit
('MMWU') is designed to mobilize swiftly from the base
of a single work platform to any offshore workover or
drilling site globally. Our best selling rig facilitates
efficient reworking and repairing of oil wells with the
ability to perform the following activities:
- Drilling out cement plugs
- Cutting out and retrieval of casing for washing
- Running intermediate casing strings
- Placing bridge plugs
- Conducting casing pressure tests
- Repairing well heads
- Conducting fishing jobs
- Replacing Christmas trees
- Well testing
- Well abandonment
- Wellbore cementing and plugging-back
The MMWU is modular in design with optimal
component weights as well as easy mounting and dismounting
connections that facilitate quick assembly, installation
and dismantling. |
|
MMWU
brochure download
|
|